Ship Details

Achiever; British
LNG
  • BP are ISM Manager
  • Joint Venture
  • Managed by BPS
  • Manned by BPS
747432/9766542
2018
Daewoo Shipbuilding & Marine Engineering (DSME) S. Korea (Yard No. 2442) for BP Shipping Ltd.
94,442d
LNG
115,366g. 34,609n.

294.9 (BB) (282.9 BP) x 46.436 (46.0 moulded x 26.5 (12.522 dt) metres

Two, LNG fuelled, 5-cyl. 2 SCSA (700 x 3256mm) MAN B&W 5G70ME GI type by Doosan Engine Co. Ltd, S. Korea. 18,200kw (24,745 BHP) @ 83 rpm. 15 knots.

2014: Ordered by BP plc from Daewoo Shipbuilding & Marine Engineering (DSME) S. Korea (Yard No. 2442) for BP Shipping Ltd.

27.12.2017: Keel laid for Natural Gas Ocean Transportation Investment No. 20 SPC B SA, Panama.

24.3.2018: Launched. 25.10.2018: Completed (BP Shipping Ltd, operational managers) under Isle of Man flag.

10.2019: Still on Sea web – in Commission
2020-07-15

Notes

Year
Notes

Web Links